Lindab, Sweden: Automated high-bay storage

Lindab is a well-known trademark in the construction industry, standing for high quality and sustainable solutions. The new distribution center consists of an automated high-bay storage facility that has the capacity to handle 250 pallets in and 250 pallets out per hour.

Movie: Lindab, Sweden

The distribution concept of the future

The new distribution center has a total space of 10,600 square meters. The automated high-bay storage facility occupies 4,900 square meters and has the capacity to handle 250 pallets in and 250 pallets out per hour.

The facility has been built upwards to maximize the potential storage volume in an area with limited access to land.

Lindab‘s new automated distribution center in Grevie, Sweden.

Lower costs, higher service levels and better sustainability

Swisslog’s scope included delivering all warehouse equipment for the automated high-bay storage facility with space for 21,500 pallets, extendable by a further 6,300 pallets, 8 Vectura S22 stacker cranes, 16 dynamic picking stations and a ProMove Conveyor System.

The project also included delivery of the software required to run the facility efficiently in collaboration with Lindab’s own WMS.

We chose Swisslog due to a combination of its large number of outstanding reference projects and its ability to deliver an integrated total solution.

Miroslav Anic, Distribution Center Manager