![](/-/media/swisslog/images/logistics-warehouse-distribution-automation/case-studies/food-and-beverage/pepsi/pepsi_powerstore.jpg?rev=f6ad05d3a10f43c391f8b6e507a1e1b8&w=1900&hash=819E25739378A2D87490DD342E929E79)
Pepsi, USA: Increased storage capacity by 61.5%
Pepsi Bottling Ventures (PBV) in Garner, NC, USA has installed the revolutionary Swisslog PowerStore™pallet shuttle warehouse automation technology. The nation‘s largest privately-held manufacturer, seller, and distributor of Pepsi-Cola beverages, chose PowerStore technology to increase storage capacity by over 60 percent in its existing flat-ceiling building.
![](/-/media/swisslog/images/logistics-warehouse-distribution-automation/case-studies/food-and-beverage/pepsi/pepsi_space-saving-powerstore.jpg?rev=9fe6e84b4c144a23ae3706d247942f75&w=1400&hash=CA98FF19C2A84FA95655BD99459F2815)
Storage capacity increased by 61.5 percent
Pallets in the 54,000 square foot warehouse were previously stored on the floor up to four high. PowerStore ™ enabled Pepsi Bottling Ventures to:
- Increase storage capacity by 61.5 percent
- Seamless distribution of 7,800 pallets
- Double layer induction/deduction for ease of use by lift drivers increase throughput and employee productivity
- Seamlessly integrate software with existing ERP system
![](/-/media/swisslog/images/logistics-warehouse-distribution-automation/case-studies/food-and-beverage/pepsi/pepsi_powerstore-is-highly-flexible-and-scalable.jpg?rev=1d3f52e3961c4c3a8640254bf947f610&w=1400&hash=FD9DA068832C5BB3605C52ECE62593DF)
Constant fulfillment with just enough automation
Swisslog designed and implemented the Batesville distribution center using advanced warehouse execution software (WES) to help workers quickly and accurately pick and pack orders.
- Can handle a wide variety of SKU volume and velocity
- Highly flexible and scalable solution
- Includes split-case pick modules, cart picking from bin rack locations, cold-storage picking and pack-out stations.
An overall traditional expansion would have been less desirable because it builds in permanent, long- term inefficiencies through greater fork-lift travel time and facility heating and cooling costs.